General inquiries
Questions about EC Roadmap, licensing, or anything else — we're happy to help.
info@ecroadmap.comTechnical support
Troubleshooting, activation issues, or questions about using the app.
support@ecroadmap.com01Getting started
| Requirement | Details |
|---|---|
| Operating System | Windows 10 or later |
| Disk Space | Approximately 150MB installed |
| Microsoft Excel | Required for the Excel template workflow (2016 or newer recommended) |
| Microsoft Project | MS Project is only required when using the direct MS Project integration features. If you are using the Excel template workflow, MS Project is not required. When using direct MS Project integration, MS Project must be installed on the same machine as EC Roadmap. |
| Microsoft PowerPoint | Not required to generate slides — only needed to open the output .pptx files |
02MS Project integration
| Field | Default | Purpose |
|---|---|---|
| Roadmap Tags | Text1 | Controls the role of each task — see tag values below |
| Swimlane / Child | Text2 | Optionally redirects a task to a different swimlane |
| Alternate Name | Text3 | Optionally overrides the display name for any row |
Tag values for Text1 (Roadmap Tags)
| Tag | Meaning |
|---|---|
Roadmap | Names the roadmap — use on a summary task. Becomes the slide title. |
Swimlane | Sets the current swimlane. All tasks below inherit this until the next Swimlane tag. |
Child | Sets a child swimlane within a swimlane (requires Parent/Child mode enabled). |
Task | Draws a task bar using the current swimlane context. |
Milestone | Draws a milestone diamond. Task must have matching Start and Finish dates. |
SD | Significant Date — draws a vertical marker spanning all swimlanes. |
You can change which Text fields EC Roadmap maps to each role in the MS Project tab under Field Mapping.
Browse for MPP
Click Browse and select your saved .mpp file. EC Roadmap connects to MS Project to read the file — MS Project must be installed but does not need to be open.
Read active project
If MS Project is already open, click Read Active Project. EC Roadmap connects to the running instance and reads all tagged tasks. A confirmation dialog shows the project name before proceeding.
Active selection
With MS Project open and tasks selected, click Read Selection. EC Roadmap reads only your currently highlighted tasks — useful for generating a roadmap from a subset of a larger schedule.